How QA/QC Bridges the Gap Between BIM and Field Reality

The lack of “true” as-builts can be the biggest challenge when dealing with existing field construction conditions. The available construction documentation that purports to be existing is usually not consistent with field reality – even after having been run through trade coordination. Without accurate information regarding existing conditions, the planning and design of new work will be undermined, causing substantial rework, delay, cost overrun, and even project shutdown.

 

This webinar recording demonstrates how Dome Construction is using a QA/QC process that features variance reporting that compares their existing BIM to a reality capture point cloud scan to establish “true” as-built conditions to begin the retro-fit design process. The use of SolidSpac3 technology is helping to minimize errors and omissions, increase profit margins, produce greater project ROI, and create a higher quality customer deliverable.

 

Please complete the form on this page to watch the video at your convenience!

Watch the Webinar Recording

Fill out the form below to gain access to the video recording.

Name(Required)

Presenters:

Gene Roe, Ph.D.,

Founder,
Lidar News

Alex Von Svoboda

Vice President of Sales,
Solidspac3

Li Jiang, Ph.D.,

Sr. BIM Engineer,
Dome Construction

Add Your Heading Text Here

For more information please visit solidspac3.com or contact us at info@solidspace.com